RRUK Homepage
  About Us
  ---Vision
  ---Partners
  Research
  ---Engineering Interfaces
  ---Whole System Performance
  ---Users, Community and Environment
  Links
  Contact
  Membership
  ---Apply to Join
  Reports & Publications
  External Reports
  Opportunities
  Login
 Add new link

Project Reports

 
  • Bye, R., Hockey, G.R.J. (2006). Cognitive work analyses to investigate macroergonomic issues in train driver performance. Draft technical report prepared for RRUK project B3.
  • Cox, G., Farrington-Darby, T., Wilson, J.R. (2006). Expertise in Railway Signalling: An analysis of the work of signallers and the skills, characteristics, knowledge and strategies that contribute to expert performance. IOE/RAIL/06/04DR.
  • Farrington-Darby, T., Wilson, J.R. (2006). Expertise in Railway Control: A work analysis of the skills, characteristics, knowledge and strategies that contribute to expert performance in railway control. IOE/RAIL/06/01DR.
  • Fowkes, A.S., Johnson, D.H., Whiteing, A.E., Nash, C.A. (2006). Freight Modelling Report. RRUK Report C3/5.
  • Hatano, L. (2006). Comparing the Kyushu and UK transport and rail markets. RRUK/B5/2.
  • Hatano, L. (2006). International Railway Comparisons & Benchmarking. RRUK/B5/Final.
  • Preston, J., Wall, G., Whiteing, A. (2006). Rail User Needs and Delivery Mechanisms: Final Report. Report RRUK/C2/06.
  • Wall, G., Preston, J. (2006). Channel Migration. Virgin Trains Case Study. Report RRUK/C2/04b. Commercial in confidence.
  • Wall, G., Preston, J. (2006). Passenger Rapid Review Case Studies. Report RRUK/C2/02.
  • Wall, G., Preston, J. (2006). Wi-Fi Review and Case Study. Report RRUK/C2/03. Commercial in confidence.
  • Wall, G., Preston, J. (2006c). Channel Migration. GNER Case Study. Report RRUK/C2/04a. Commercial in confidence.
  • Whelan, G.A., Lythgoe, W., Menaz, B., Nash, C.A., Wardman, M. Li, Y., Preston, J.M. (2006). Rail Passenger Modelling. RRUK C3/4
  • Whiteing, A.E., (2006). Rail Freight Information Systems – The Potential for User Benefits in the Light of European Research. Report RRUK/C2/05.
  • Bowness, D., Priest, J.A., Powrie, W. (2005). Dynamic Sleeper Displacement Measurements at the Alsops Road Tunnelling Site. RRUK Report A1/03 (Prepared for CTRL)
  • Chen, R., Rama, P., Thring., Hillmansen, S., Smith, R.A., Rahal, Z., Bauen, A., Hart, D. (2005). Power Futures Group: Report of RRUK funded project: Feasibility and Benefits of Future Power Technologies – a preliminary analysis. RRUK Report C4/1.
  • Crockett, J., Beecroft, M., McDonald, M., Whiteing, T., Wardman, M., Nash, C., Fowkes, T., Whelan, G. (2004). Rail User Needs and Delivery Mechanisms. RRUK Report C2/02.
  • Farrington-Darby, T., Wilson, J.R., Hockey, G.R.F., Bye, R. (2005). Human Factors Integration in the UK Railway Industry. RRUK Report B2/2
  • Fowkes, T., Johnson, D., Nash, C.A., Whelan, G.A., Whiteing. A.E. (2005). Modelling Proposals. RRUK Report C3/3.
  • Hockey, G.R.F., Bye, R., Farrington-Darby, T., Wilson, J.R. (2005). The Understanding and Integration of Human Factors across the Railway Network. RRUK Report B2/1.
  • Wilson, J.R., Farrington-Darby, T., Hockey, G.R.J., Bye, R. (2005). Human Factors Integration in the UK Railway Industry. RRUK Report B2/2.
  • Bowness, D., Powrie, W., Richards, D.J., Lock, A.C., Clayton, C.R.I. (2004).Report on field observations of the performance of railway track – location, Crewe. RRUK Report A1/02 (prepared for BB Rail)
  • Farrington-Darby, T., Wilson, J.R. (2004). The nature and development of expertise in railway controllers: A preliminary framework. University of Nottingham. IOE/ RAIL/04/02 DR
  • Menaz, B., Nash, C.A., Shires, J.D., Whiteing, A.E., Beecroft, M. (2004). Rail/Road Strategies & External Scenarios. RRUK Report C3/2.
  • Davis, C.L. (2003). Modelling and Detecting Damage (Wear and RCF) in Rails. RRUK Report A2/3 (prepared for RSSB)
  • Donohew, B., Griffin, M.J. (2003). Simulator for Optimising Train and Passenger Crew Environments. RRUK Report C1/1 (prepared for RSSB)
  • Franklin, F., Kapoor, A. (2003). Representing Microstructure in the Dynarat Wear Model. RRUK Report A2/2 (prepared for RSSB)
  • Goodall, R.M., Pearson, J. (2003). System Level Cost Framework. RRUK Report B4/1 (prepared for RSSB)
  • Goodman, C., Takagi, R., McDonald, M., Armstrong, J. (2003). Decision Support System for Dynamic Rescheduling of Trains Under Disturbance. RRUK Report B1/1(prepared for RSSB)
  • Hockey, G.R.F., Carrigan, N. (2003). Human Factors in Railway Systems: Implications for Safety. RRUK Report B3/rssb (prepared for RSSB)
  • McDonald, M., Crockett, J., Beecroft, M., Nash, C., Menaz, B., Fowkes, T. (2003). The Role of Rail in Integrated Transport. RRUK Report C3/1 (prepared for RSSB)
  • Powrie, W., Bowness, D. (2003). Appraisal of track/sub-base performance using modern geotechnical principles. RRUK Report A1/01 (prepared for RSSB)
  • Thompson, D.J., Monk-Steel, A.D., Jones, C.J.C., Allen, P.D., Hsu, S.S., Iwnicki, S.D. (2003). Railway noise: curve squeal, roughness growth, friction and wear. RRUK Report A3/1(prepared for RSSB)
  • Vasic, G., Franklin, F., Kapoor, A. (2003). New Rail Materials and Coatings. RRUK Report A2/1 (prepared for RSSB)
Home | About | Contact | Research | Links | News | Login